Historical hydropower dam and reservoir locations for ISIMIP4a Group III simulations.
Scenarios: histsoc
Variables:
Specifications
Extends the ISIMIP3a historical dam record (GRanD v1.3 + KSU, mapped to the DDM30 river-routing grid) with dams completed since 2020, using Global Dam Watch v1.0 (Lehner et al. 2024) to identify newly built dams. Covers 1850–2022. Visit the ISIMIP3a documentation for further details: https://www.isimip.org/gettingstarted/input-data-bias-adjustment/details/129/
Global Dam Watch v1.0 records only a small number of dams completed after 2020 (13, most recent 2022); large dams completed more recently (e.g. GERD, 2024) are not yet included, pending a more current source.
Unlike in the ISIMIP3a dataset, the final visual-validation and manual-relocation step (applied in ISIMIP3a to large dams, reservoir volume > 0.5 km³, 1,108 dams) was not conducted for the newly added 11 dams.
Download Instructions
For ISIMIP participants, files are available at /work/bb0820/ISIMIP/ISIMIP4a/InputData/socioeconomic/reservoirs_dams/
Cookies disclaimer Our site saves small pieces of text information (cookies) on your device in order to deliver better content and for statistical purposes. You can disable the usage of cookies by changing the settings of your browser. By browsing our website without changing the browser settings you grant us permission to store that information on your device. Read more